Validate your project's feasibility before development
We turn an initiative into a structured project through discovery, requirements, preliminary architecture, feasibility evaluation, prototypes, estimation and roadmap. The goal: reduce technical and economic uncertainty before committing a larger investment. Documented methodology (BWhale Pre-Project Manual 2026: 7–12 weeks, 5 stages).
Pre-project deliverables
-
Requirements and diagnosis
Requirements gathering and process diagnosis focused on the real operation.
-
Preliminary architecture
Solution architecture plus technical and economic feasibility evaluation.
-
Prototypes and estimation
Wireframes and clickable prototypes + effort estimation and roadmap.
Documented methodology: 7–12 weeks, 5 stages
The stages of the BWhale 2026 Pre-Project Manual, with progressive discovery, documented validations and controlled adjustment.
-
Research
Discovery of context, users, processes, constraints, data, integrations, risks and initial feasibility.
2–4 weeks
-
Planning
Definition of tasks, milestones, required team, validation criteria, dependencies, roadmap and preliminary estimation.
-
Functional modeling
Information architecture, flows, module structure, wireframes and operational rules.
-
Visual modeling and prototyping
Design system, mockups, prototypes, interaction criteria and usage validation.
-
Delivery and review
Results presentation, report, planning, budget and formal approval.
2 weeks