Well Node
Self-installable well telemetry: measures groundwater level, flow and pressure, activates the pump and reports every hour to the DGA's Effective Extraction Monitoring (MEE) system.
Measure and report water extraction without driving to the well
Holders of groundwater rights in Chile must install a monitoring system and transmit their effective extractions to the General Water Directorate (DGA). The technical standard is DGA Exempt Resolution No. 1238 of 2019, applied according to the standard the DGA assigns to each well.
On scattered farms, with wells far from the office and limited connectivity, reading the flowmeter and uploading data by hand does not scale. The Well Node automates both measurement and reporting.
How it works
-
Measures every minute
The node records flow, groundwater level and accumulated volume, and stores up to 10,000 records on the device.
-
Sends to the platform
Data travels over cellular networks (4G/5G, NB-IoT or LTE Cat-M) to the Calgrow platform. If the signal drops, it resends the data once reconnected.
-
Reports to the MEE
The platform transmits to the DGA's Effective Extraction Monitoring (MEE) software every hour, with no manual work.
-
Alerts and controls
The web and mobile app show level, flow and totals, export reports and send alerts by email or WhatsApp. The node also measures pressure and can activate the pump.
Specifications
- Measurements
- Groundwater level, flow, accumulated volume and pressure
- Level sensor
- 0–200 m · 4–20 mA, 0–10 V or RS485 Modbus output
- Compatible flowmeters
- DN50 to DN1000 pipes · 4–20 mA, RS485 or RS232 output
- Connectivity
- Cellular 4G/5G, NB-IoT or LTE Cat-M (nano SIM) · BLE and Wi-Fi as secondary link
- Interfaces
- RS485 / RS232, SDI-12, GPIO and analog inputs
- Power
- Solar panel with rechargeable internal battery · external 5–24 VDC or 220 VAC input
- Storage
- Up to 10,000 records on the device, backed up in the cloud
- Enclosure
- Sealed industrial IP68 enclosure with M12 connectors
- Mounting
- 3 m pole in three sections
Regulation and Control Center
The obligation to monitor and transmit effective extractions comes from Law 21,064 and the Chilean Water Code. For groundwater, the technical conditions and deadlines are set by DGA Exempt Resolution No. 1238 of 2019, as amended by Resolution No. 564 of 2020.
Online transmission to the MEE is made from a Control Center registered with the DGA. Sistemas Tecnológicos OSystems SpA, BWhale's Chilean company, appears on the DGA's official list of registered Control Centers.
DGA list of registered Control Centers (PDF, April 2026)Frequently asked questions
What's in the kit?
The telemetry node (datalogger), a groundwater level sensor with the cable length your well needs (50 to 120 m), connectors, a mounting pole, a solar panel with battery, platform access and the first year of automatic reporting to the DGA.
Does it report to the DGA on its own?
Yes. It sends data to the Effective Extraction Monitoring system every hour, with no manual work, from a Control Center registered with the DGA.
Can I install it myself?
Yes, in three steps: the pole, the sensor through the well's air line and the flowmeter connection. A qualified electrician should connect it to the electrical panel.
What do I need before installing it?
A 1.5" PVC air line down to pump depth, a 220 VAC outlet near the well (ideally the pump panel) and room to face the node north for the solar panel.
What happens if the signal drops?
The node stores the data, up to 10,000 records, and resends it automatically once reconnected.
Do you help register the well in the MEE?
Yes, at no extra cost: we register the well and configure the device for its standard. You need your current water right, the well coordinates and the flowmeter data sheet, if any.
Is there a warranty?
Yes, one year against manufacturing defects on the node, sensor, connectors and solar panel.
How much does it cost?
It depends on the sensor length and the annual reporting service. Ask us for a quote for your well.
